IAC staff have wide experience in R&D&I project management. The IAC’s Technology Division, in particular, develops instruments from the initial proposal and concept stages through design and manufacture to assembly and commissioning at the telescope. Engineering staff, organized under a matrix structure with departments based on different technical capabilities, work in multidisciplinary project teams with specific personnel responsible for project management and technical direction, ensuring compliance with specifications and delivering the project within the scope, in budget and on time. This experience and training transcends astrophysical instrumentation and has application to the management of any R&D&I project in a scientific or industrial environment.
