GREGOR telescope: start of commissioning

Volkmer, R.; von der Lühe, O.; Denker, C.; Solanki, S.; Balthasar, H.; Berkefeld, T.; Caligari, P.; Collados, M.; Halbgewachs, C.; Heidecke, F.; Hofmann, A.; Klvana, M.; Kneer, F.; Lagg, A.; Popow, E.; Schmidt, D.; Schmidt, W.; Sobotka, M.; Soltau, D.; Strassmeier, K.
Referencia bibliográfica

Ground-based and Airborne Telescopes III. Edited by Stepp, Larry M.; Gilmozzi, Roberto; Hall, Helen J. Proceedings of the SPIE, Volume 7733, pp. 77330K-77330K-9 (2010).

Fecha de publicación:
7
2010
Número de autores
20
Número de autores del IAC
1
Número de citas
0
Número de citas referidas
0
Descripción
With the integration of a 1-meter Cesic primary mirror the GREGOR telescope pre-commissioning started. This is the first time, that the entire light path has seen sunlight. The pre-commissioning period includes testing of the main optics, adaptive optics, cooling system, and pointing system. This time was also used to install a near-infrared grating spectro-polarimeter and a 2D-spectropolarimeter for the visible range as first-light science instruments. As soon as the final 1.5 meter primary mirror is installed, commissioning will be completed, and an extended phase of science verification will follow. In the near future, GREGOR will be equipped with a multi-conjugate adaptive optics system that is presently under development at KIS.