Control quality of seeing measurements provided by the DIMMA at the ORM
Control quality of seeing measurements provided by the DIMMA at the ORM Antonia M. Varela, Casiana Muñoz-Tuñón & Julio Castro-Almazán Feb-2013- Technical report ------------------------------------- An automatic DIMM is installed near the GTC site. Data have been validated and the results presented in this document. Real time values are accessible at http://www.iac.es/site-testing/DIMMA_ORM. The comparison baseline spans from April to October 2012. Mean and median values in this period are 0.95” and 0.86” respectively.
Fecha